March 15, 2008

Rooms taking shape........

The piano room, aka Louise's room



Emily's room - wardrobe corner back right



Looking out of the bathroom



R, imitating those guys who sit on high girders in New York, fixing the board around the stairwell




Emily's brilliant idea - to have a big space to light the staircase naturally. This is the wall between the staircase and the hall.

March 12, 2008

The inside is taking shape....

.... with every bit of plasterboard. We have hired a nifty piece of kit to help R - cheaper and less likely to hammer nails in the wrong place than a labourer.


Here it is - you put the board onto it and wind it up to the ceiling, then start on the lower part and screw it it - voila. Himself is aiming for 16 boards a day and did 10 yesterday - not bad for the first day. Plus he has to put some bits at a slant on the sloping ceiling.

What else? we now have first fix electrics and plumbing done and most of the ventilation system, seen here
- lots of shiny pipes, very lightweight and easy to fix. I have a bit of a tic about ventilation and so I'll be monitoring indoor air quality.

Wednesday
The ceiling for one side of the first floor is now complete, together with a hole in the ceiling for loft access from Emily's room.

March 01, 2008


HAPPY MOTHERING SUNDAY TO THE BEST MUM IN THE WORLD



These are photos of the view from all sides of the house, for my mum


First floor, south window looking left




First floor, north window




First floor, north window looking left




First floor, north window looking right




Ground floor, front door (east) looking right




Ground floor, front door (east) looking left




Ground floor, north window looking left




Ground floor, west window looking left




Ground floor, south window




Ground floor, south window looking left




Ground floor, south window looking right

February 28, 2008




The plasterboard came last week - tons and tons of it - about 370 sheets in total. We shifted more than half of it into the house and then gave up cos my shoulders started to grumble as did the floor joists.


I went away on a course for a week and when I came back all sorts of exciting things were happening. The place was hung about with electric wires like lianas in the jungle - the illusion heightened by the fact that the house is getting quite warm these days, with the insulation and all. The other morning I went in there at 8.30am - it was freezing outside - ice on the cars - and 14 degrees C inside. Result!!






R is having fun - he has lots of creative things to do which are making a big difference: hanging the building paper on all the external walls, putting in the ventilation system, organising the electricians and plumber and starting to put up the plasterboard. So the house is full of subbies, ventilation pipes, electric whatnots, piles of gypsum, the flue waiting to be installed and random bits of wood. What a difference a week makes.

February 02, 2008

When I'm sealing windows

Well, we are getting ready for the Big Plasterboard Fix (hereafter known as BPF). Him Outside was away for two weeks after Christmas (the slacker) doing a professional development course for Transcendental Meditation teachers. When he came back, after a fortnight of deep rest, he was a bit slowed down for a while, as is only to be expected, but the brain was working very well and he spent almost a week sorting out the whole of the remaining build - all the materials needed and the sequence of work.

In the meantime since the last blog I started a job and finished it! I worked for two weeks as Planning Receptionist at Norwich City Council, but the work was unexpectedly heavy: big files stuffed with Decision Notices to be picked up from floor level all the time and only me to do it. I put my poor frozen shoulders back a bit and they started to seize up again after the first week. So I reluctantly handed my notice in.

Anyway, the good side of that is that I've been working with R to get all the people and stuff we need together and it's gone a lot faster with two of us. He works out the details and I run around getting the deals - quite a good team really.

To get ready for the BPF we need lots of bits and pieces:
More blue tape to seal the windows and doors
Sisalkraft paper to put on the walls before the BFP starts to up the vapour resistance
Blokes, as follows:
electrician to do first fix
plumber to finish first fix
stove and flue man to put in stove and flue
labourer to help with BPF
someone to do an air change pressure test to check airtightness
Details of the ventilation and heat recovery system
A bath, two showers and the screens
Best prices for a squillion little bits of wood for door linings, skirtings, architraves, window sills, the ramp, the vastu fence, balustrades, handrails, etc, etc....

Things like choosing the kitchen units and light fittings are going to be a doddle!

In the meantime, I'm signing up with agencies for temping, which might be better for us cos then I can get stuck in when we need stuff doing on the house. Plus we've started teaching TM, having converted the spare room into a bijou teaching room.

Anyway, we are working together on preparing the rooms for the BPF - Sealing windows, fitting sills, sealing all the holes the Warmcel went into, tidying up the floor, sealing the angle between the roof and shoving little bits of rockwool into every possible orifice, as in the next two photos:

Smile for the camera



AND he is finishing The Wall - doing the little sexy curvy bit of brickwork and the tile capping on top - and it's looking very nice. When it's finished, we'll have a celebration with the neighbours - I shall make a cake and maybe we'll break a bottle on it!



January 05, 2008

Floored.

Well we had a couple of weeks off, but the house carried on without us. The shredded-newspaper-insulation guys were in for several days over Christmas and the house is now completely surrounded like one of those old fashioned padded envelopes that used to leak little bits of paper over the carpet when you opened them. So as soon as we finish sealing round the Velux windows in the roof, we'll have some idea whether this passive house will really work or whether we need to get a few radiators after all.

The next four things are:

choose the electrician and decide whether we can afford the extra needed for shielded cable;
order more blue tape to cover the holes through which the Warmcel went and to seal the inside of the windows;
find kraft paper to increase the vapour control on the inside of the external walls (it goes between the panels and the plasterboard so needs to go on soon) walls, to prevent interstitial condensation; and
decide about whole house heat recovery ventilation (depends partly on how well sealed the house turns out to be: see paragraph above).
Once the Warmcel installers had filled up the ground floor they could cover it with its final layer of Weyroc, like the first floor - here are a few pics. Very smooth and grey looking, but quite smart and hardwearing. It makes a real difference to the look and the feel of the house - not least because R cleared the floor area so they could put it down. The pictures show the glue between the panels which we will trim off.




December 19, 2007

The moment the world has been waiting for:


December 14, 2007

Oh boy, oh boy - a house has appeared in our garden - from behind a pile of scaffolding. Two blokes came in the morning and before you could say monkey wrench the scaffolding was in neat piles in the garden.

Photos of the transformation. It was a really exciting day - I did no work at all, just kept dotting in and out of the caravan getting in the way.

The













Another very exciting thing happened while I was away today, inspecting my new job at Norwich City Hall - I came back to find a front door! Screwed onto the house! I'll take a picture tomorrow morning. That'll please my mum! Also Mo, as I can now do the much heralded video walk-through of the house and put it on YouTube with a link from the blog.

December 06, 2007

Rendered!

Oh yes, we have a whole house which is the colour of sponge cake mix. Victoria sponge that is. There are some darker places where the last bits haven't dried yet - takes about a week. It goes on a bit like cake mix too - they put it on like a small child would plaster the nursery wall - a lot drops off. We will be able to grow a lot of lime-loving plants round the house.

Plus this was the second day of the Warmcel brigade shovelling finely shredded newspapers (and apparently Yellow Pages) into the walls. Here's a picture of it as it comes out of the bags.

In the back of this van

there is a piece of kit that you shove the stuff into, one bag at a time.

The POK sort of rubs the compacted stuff between its hands, as it were, and fluffs it up, then it goes down a very long elephant-trunk-grey hose

into the walls through the holes which they cut earlier

There's a lot of standing around waiting for each panel to fill up. These are very big walls.

I am a little concerned to be certain that all the panels really are completely full and I want to be able to check that there has been no settling. I think the best thing, in a couple of days' time, is to put a small hole in the top of each panel and stick my finger in to make sure they are all still full right to the top.

I think they'll be here for a few days yet - they have been here two days and done most of the upstairs. Still got the ground floor walls and the ground floor itself to do.

The house was full of a faint greyness with little piles of fluffed-up Warmcel which had escaped from the elephant trunk

looking like an old lava flow. The chaps like using it because it is completely benign and non-toxix, unlike the mineral wool or glassfibre which they also install.

Anyway these guys were buzzing about inside and Lee and his mate were buzzing about outside - stereophonic, non-matching music from different boom boxes. And the second electrician came too - he spent an hour or so talking through what we want. Gosh and golly electricianing is complicated stuff - all the rules and relgulations, the special fitings for bathrooms, installing TV and satellite and telephone cables, cables to the shed underground, specified minimum and maximum distances, requirements for low-energy fittings, and so on and so on. Anyway we should have a quote for all that stuff soon. Oh yes, AND we want shielded cable to protect from electromagnetic stress if possible too!

R spent the little time he had when not running around after everyone else altering the head of the front door opening to be able to fit the door and a timber door sill it - this involved taking the frame apart and cutting bits off and putting it back together.

My hero!

Oh and it poured down most of the day.....

Me? I made the tea

One last view of the front wall being rendered